
Lebanon · 2002-2012
Tripoli Wastewater Treatment Plant
Location
Tripoli, Lebanon
Client
Council for Development and Reconstruction
Period
2002-2012
Sector
Water Utilities
Scope of Services
- Construction supervision
- Technical assistance
Tripoli Wastewater Treatment Plant
Tripoli, Lebanon's second city, discharged its wastewater untreated directly into the Mediterranean for years, with serious consequences for public health and the coastal environment. A large-scale treatment plant and sea outfall was programmed under the Council for Development and Reconstruction.
Libanconsult supervised the plant and its outfall across two assignments for the CDR: the main WWTP and sea outfall supervision (2002-2012) and a parallel dedicated sea outfall supervision (2005-2007), covering construction supervision, technical assistance and shop drawing approval.
The plant treats 1,000,000 Population Equivalent using a medium-concentration activated sludge process, with sludge incineration and electricity production. The dedicated sea outfall is 1,650 m long at 1,400 mm diameter, sized for 5 m3/s.
The scheme ended untreated discharge from Lebanon's second city and remains among the largest wastewater facilities in the country.



