Lebanon · 2007-2008
Cimenterie Nationale Seawater Intake System
Location
Chekka, Lebanon
Client
Cimenterie Nationale S.A.L
Period
2007-2008
Sector
Ports & Coastal
Coastal Protection
Scope of Services
- Detailed design
- Tender documents
- Construction supervision
Project Overview
Cimenterie Nationale Seawater Intake System
Cimenterie Nationale S.A.L needed a dedicated seawater intake to supply process water to its Chekka plant continuously from the adjacent Mediterranean coast.
Libanconsult designed and supervised the full scheme in 2007-2008.
The system comprises an intake channel, pumping station structures, an inlet water reservoir, underwater concrete works and the reinforced-concrete structures required for continuous abstraction and delivery to the plant.
One of Lebanon's major cement producers draws its process water through infrastructure designed and built under a single engagement.